October 15, 2025

SJVN receives Letter of Intent from Government of Mizoram for 2400 MW Darzo Lui Pumped Storage Project

Date:

Share post:

SJVN has received a Letter of Intent (LoI) from Government of Mizoram for allotment of Darzo Lui Pumped Storage Project to the company through MOU route on nomination basis.

With an installed capacity of 2400 MW, the Pumped Storage Project has been proposed across Darzo Nallah, a tributary of Tuipui river. The estimated cost of project on completion is Rs 13947.50 crores including IDC and Financing costs at April, 2023 Price Level. This is the first project of the company in the state of Mizoram.

Darzo Lui Pumped Storage Project is an On- stream Closed Loop Type pumped storage project. It envisages utilization of available gross head of upper and lower reservoirs of 770 metre. The upper reservoir is proposed on a minor stream of Hnahchanglui Nallah in Koladyne Tuipui River near Village South Vanlaiphai of District Hnahthial. The lower reservoir is proposed in Darzo Nallah around 5.5 km upstream of the confluence with Tuipui river near Vertek village.

As per the LoI, an agreement shall be signed within three months between SJVN and Government of Mizoram.

Daily News Bulletin

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Related articles

Himachal CM Promotes E-Mobility, Flags Off E-Taxis

Chief Minister Thakur Sukhvinder Singh Sukhu today flagged off 18 electric taxis from his official residence Oakover under...

रामपुर बुशहर में अग्निवीर भर्ती, SDM नोडल अधिकारी

भारतीय सेना में भर्ती के इच्छुक युवाओं के लिए एक महत्वपूर्ण अवसर आने वाला है। सेना भर्ती कार्यालय,...

Centre Sanctions Ropeway for Shimla: Agnihotri

In a major boost to Shimla's urban mobility infrastructure, Deputy Chief Minister Mukesh Agnihotri today announced that the...

Advanced Surgery Facilities for Nerchowk GMC

CM Sukhu, while presiding over the IRIS-2025 programme at Lal Bahadur Shastri Government Medical College, Nerchowk (Mandi district),...